Customization: | Available |
---|---|
Warranty: | 5 Years |
Nature of Source Flow: | Active Inverter |
Suppliers with verified business licenses
Model | SUN-4K-SG05 LP3-EU-SM2 |
Battery Type | Lead - acid or Lithium - ion |
Battery Voltage Range (V) | 40 - 60 |
Max.Charging Current (A) | 95 |
Max.Discharging Current (A) | 95 |
Charging Strategy for Li - ion Battery | Self - adaption to BMS |
Number of Battery Input | 1 |
Max.PV Input Power (W) | 6000 |
Max.PV Input Voltage (V) | 800 |
Start - up Voltage (V) | 160 |
MPPT Voltage Range (V) | 200 - 650 |
Rated PV Input Voltage (V) | 550 |
Max.Operating PV Input Current (A) | 20 + 20 |
Max.Input Short - Circuit Current (A) | 30 + 30 |
Rated AC Input/Output Active Power (W) | 4000 |
Max.AC Input/Output Apparent Power (VA) | 4400 |
Rated AC Input/Output Current(A) | 6.1/5.8 |
Max.AC Input/Output Current (A) | 6.7/6.4 |
Max. Continuous AC Passthrough (grid to load) (A) | 45 |
Peak Power (off - grid) (W) | 2 times of rated power, 10s |
Power Factor Adjustment Range | 0.8 leading to 0.8 lagging |
Rated Input/Output Voltage/Range (V) | 220/380V, 230/400V, 0.85Un - 1.1Un |
Rated Input/Output Grid Frequency(Range)(Hz) | 50/45 - 55, 60/55 - 65 |
Grid Connection Form | 3L + N + PE |
Total Current Harmonic Distortion THDi | <3% (of nominal power) |
DC Injection Current | <0.5% In |
Max.Efficiency | 97.60% |
Euro Efficiency | 97.00% |
MPPT Efficiency | >99% |
Q1: Do Purebus energy systems comply with international electrical and safety standards?
A1: Yes. All systems meet relevant IEC/CE/UN38.3 safety and EMC standards. Components undergo extensive testing for electrical protection, fire safety, and environmental durability (e.g., IP54/IP66 rated enclosures).
Q2: Can you provide customized configurations (e.g., capacity, voltage, communication)?
A2: Yes. Custom options include battery capacity (up to 280Ah/module), nominal voltage (LV 51.2V or HV 135-750V), and communication protocols (CAN, RS485, Wi-Fi, Ethernet). Both modular and rack-mounted systems are available.
Q3: What is the lead time for delivery?
A3: Standard products can be shipped within 7-10 working days. For customized models or large quantities, lead time is typically 20-30 days. Expedited orders and scheduled production are available upon request.
Q4: Do you support third-party inspections?
A4: Yes. Purebus welcomes third-party inspections from SGS, TUV, or client-assigned agents. Full test reports and compliance certificates are provided before shipment.
Q5: Are systems compatible with other inverter brands?
A5: Yes. Energy storage systems support open protocols (CAN/RS485) and can be integrated with a wide range of inverter brands. Configuration tools and wiring diagrams are provided for seamless setup.